Assembly
Putting the Chain back on with the New Kicker
After adding rubber padding to the kicker, it is put back on the robot, and the chains must be re-assembed. Aren't chain tools fun!
February 18, 2010
Tapping Holes for the Lifting Arm Mechanism
Eric Trumble works on assembling the Lifting Arm.
February 18, 2010
The BERT133 Quick-Release Bumper System
Adding the bumpers to the robot.
The requirement for a quick-release bumper system prompted many great ideas. The team came up with one that we have never seen used before (thanks Ron). The bumpers were outfitted with a piece of u-channel that would slip over the robot frame. This u-channel attached to the frame with quick-release hitch pins (ball-spring-detente type) allowing for fast removal and installation.
February 11, 2010

