1/31/10
Today at Eagle Industries we made good progress. The kicker was finished with a 2:1 gear ratio and does well. The electronics have been put on but still need to be wired so the robot can be driven. The lift arm is going well, all the corners on the grab part have been rounded and it weighs a bit less. The arm is still not finished but will be by the end of the week. The bumpers have almost been finished but will now be held on by a U Channel bracket over the frame.
-Niko
Bookmark/Search this post with:
January 31, 2010


Delicious
Digg
StumbleUpon
Facebook
Google